Edit Task


The Edit Task operation allows the user to edit the currently selected scheduled task in the Schedule Manager window. The Edit operation can be categorized as
Edit Task Schedule settings
Edit Task Reports settings
 
Edit Task Schedule settings
 
In the Edit Task Schedule settings operation, the schedule settings (Run as account, schedule type and start time) for the currently selected scheduled task can be edited.
 
Click Schedule Manager... in toolbar
 
Select an existing task in either left pane or right pane, which needs to be edited.
 
Click Edit Task Schedule... button at the bottom of the Schedule Manager window.
 
The Task Properties dialog will be displayed with selected scheduled task as shown below.
 
   
 
In the Edit Task Schedule option, the Task name and Report type cannot be changed since the task is being associated with report settings.
 
The schedule settings like Run as account and password, schedule type and start time can be modified as required.
 
Click OK to save the modified settings.
 
Click Cancel to close the dialog without saving the modified settings
 
Edit Task Reports settings
In the Edit Task Reports settings operation, the reports, selected servers, report output format (export and print settings) can be edited.
 
Click Schedule Manager... in toolbar
 
Select an existing task in either left pane or right pane, which needs to be edited.
 
Click Edit Task Reports... button at the bottom-right of the Schedule Manager window.
 
The Schedule Manager loads the corresponding report dialog depending on the task's report type.
 
The report dialog with the previous settings will be loaded. Modify the report settings as required.
 
Click OK / Finish to save the settings.
 
Click Close to close the dialog without saving the settings.