FTP Standard Report Schedule

The Standard Report Schedule feature, helps the user to create scheduled tasks for generating reports in a scheduled duration. 
 

Using Standard Report schedule, the following reports can be generated at scheduled intervals:
 
FTP Server Reports  
FTP Site Reports  
Virtual Directory Reports 
It provides facility to specify the categories (tabs) for which the reports are to be generated. The categories (tabs) are maintained separately for each object. 
It provides facility to specify the path to which the reports to be exported and the format for exporting. Each are maintained separately for each object. 
It provides facility to specify the printer to which the reports could be send and is maintained separately for each object. 
How to create a new Standard Report Task?
 
  • Click Schedule Manager... in toolbar  
  • Click New Task... button at the bottom-left of the Schedule Manager window.
  • Ensure Standard Report option is selected and type the Task Name in the Task Properties dialog as shown below.
    
 
  • Specify the schedule settings (Run as account, schedule type, start time, etc).
     
  • Click OK to open the Standard Report Schedule dialog.
     
  • Click Cancel to close the Task Properties dialog.
     
  • The Standard Report Schedule dialog will be displayed as shown below:
     
    
 
Add a new FTP server / FTP site / virtual directory to the task
 
  • Select FTP Servers or FTP Sites or Virtual Directories tab as you require.
  • The bottom-left pane of the dialog provides the facility to add the new FTP server / FTP site / virtual directory to the task.
      
 
  • Type the FTP Server / FTP site / Virtual directory name in the textbox or use Browse button to select from the list. Using Browse button enables the user to select multiple objects at a time and add it to the task. 
  • When the object name is typed use Add button to add the given object to the task.
  • The Standard Report Schedule dialog will be displayed as shown below 
  
 
When the newly added task is selected, the Schedule Manager window will be displayed as shown below: